top of page
Plumber at Work

Projects

Riber Castle, Matlock.

Arch Heating Ltd was employed to install, improve, and commission a low-temperature hot water system within Riber Castle consisting of 26 luxury apartments whose main source of heating came from individual underfloor heating manifolds together with an integral pump and 3 port valve configuration. The main source of LTHW derived from its main plant room consisting of 4 large Remeha condensing boilers and circulation pump sets. 

20231218_120853.jpg
bottom of page